01.03 2024 2MW BESS system got connected! Thanks to this investment in a 2MW storage system, we want to use the yield from the PV panels even better! More of our news items 31.05 2026 Rik retired in May: a 40-year story supporting JONCKHEERE's robotization ambitions. In May we celebrated Rik Adriaen's retirement, after working more than 40 loyal years in JONCKHEERE. When we look at Rik's career, we get a clear view of JONCKHEERE's robotization history. Thanks to his strong interest in welding and a thirst for continuous learning he introduced and tested the new technologies. Read more 18.12 2025 JONCKHEERE subcontracting awarded EcoVadis Silver Medal JONCKHEERE subcontracting has successfully completed its first EcoVadis assessment and was immediately awarded a Silver Medal. With this recognition, our company ranks among the top 15% of companies worldwide assessed by EcoVadis over the past 12 months (85+ percentile). Read more 01.09 2024 Fifth phase of solar panel park In September 2024, the 5th phase of our solar panel park was connected. With this investment, we will have 1.88MW of solar panels in Roeselare, and 2.2MW in total in the group.In recent years, the JONCKHEERE group has invested heavily in greening its activities. Read more
31.05 2026 Rik retired in May: a 40-year story supporting JONCKHEERE's robotization ambitions. In May we celebrated Rik Adriaen's retirement, after working more than 40 loyal years in JONCKHEERE. When we look at Rik's career, we get a clear view of JONCKHEERE's robotization history. Thanks to his strong interest in welding and a thirst for continuous learning he introduced and tested the new technologies. Read more
18.12 2025 JONCKHEERE subcontracting awarded EcoVadis Silver Medal JONCKHEERE subcontracting has successfully completed its first EcoVadis assessment and was immediately awarded a Silver Medal. With this recognition, our company ranks among the top 15% of companies worldwide assessed by EcoVadis over the past 12 months (85+ percentile). Read more
01.09 2024 Fifth phase of solar panel park In September 2024, the 5th phase of our solar panel park was connected. With this investment, we will have 1.88MW of solar panels in Roeselare, and 2.2MW in total in the group.In recent years, the JONCKHEERE group has invested heavily in greening its activities. Read more